Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13708944

- Product Categories
- Friendly Links
Information Name: | TD-DEA1 inorganic thermal insulation |
Published: | 2015-05-04 |
Validity: | 600 |
Specifications: | |
Quantity: | 9999.00 |
Price Description: | |
Detailed Product Description: | TD-DEA1 inorganic thermal insulation instructions Scope For energy savings of 50% and 65% in hot summer and cold in winter, hot in summer and warm in winter, in the temperate regions and new construction, renovation and expansion of the public and civil construction of walls, insulation, energy-efficient roof insulation project. Paint and tile finishes outside the insulation. Including stairwells, partition walls, kitchen and toilet, enclosed balcony, roof and other maintenance of the structure, including the inner insulation. Steel building insulation, building insulation shaped structure. Finishes dry hanging inner insulation padding. Ground moisture, Master roof, green roofs, the wooden structure roof insulation. Base surface treatment 1, the substrate surface should be firm smooth, dry and clean, free of grease and other loose material. 2, shall be in accordance with the requirements of the relevant national norms on the base surface interfacial process. Construction process 1, according to insulation thickness requirements linked to the vertical alignment, and the pop-up windows and doors in the wall horizontal, vertical control lines 2, according to the thickness of the insulation layer design with inorganic insulation mortar do ash cake, red bars, ash cake, red bars distance does not exceed 1.5m 3, spraying or spray insulation mortar interface, primary interface full uniform coating, the wall Jiecha at different materials, laying steel mesh to reinforce 4, apply insulation should be layered construction, each pass thickness of not more than 15mm 5, applied 2-3 times the insulation layer is completed, the first pass compaction requirements try to make it a strong bond with the wall, twice the construction of not less than 24 hours time interval 6, the last time should reach red bars thickness and scraping bar compaction, rub flat, wall, door window flatness shall comply with the relevant standards 7, drip split seams should be directly embedded into the insulating layer 8 is applied in the second pass, the insulation layer is substantially dried Paste or made of steel wire mesh (external wall insulation or may not mesh) 9, should be prepared within 24h after construction protective insulation, non-flush, shock and vibration, thermal insulation after the final setting should be promptly sprinkler maintenance The amount of insulation products depending on the thickness of the amount of different designs based planing case, when a thickness of about 15mm, the amount of about 4.5-6kg / m This product is easy to use pre-construction must be under 5 ℃ -40 ℃ of environment make sure the vertical and flatness of the base surface if the surface is dry mortar should not avoid the crust Tiqu enhancement layer dry mortar mixed with water and then brick veneer system can choose to use alkali enhanced grid Avoid storing packaging weight 25 kg / bag should be stored in dry and ventilated warehouse, must not get wet, and when mixed with debris or hot dip galvanized steel wire cloth, use a low speed blender transport plane to be done before the construction of the base interface treatment agitation, avoid stress |
Admin>>>
You are the 15848 visitor
Copyright © GuangDong ICP No. 10089450, Hainan Italy Extension of New Materials Co., Ltd All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 15848 visitor
Copyright © GuangDong ICP No. 10089450, Hainan Italy Extension of New Materials Co., Ltd All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility